Experience

Below please find a list of chosen projects completed between 1994 and 2009:

INTERNATIONAL PAPER KWIDZYN Sp. z o.o., Poland, 1994 – 2009
  • Fabrication and erection of steel structures, tanks and process pipelines
  • Upgrades of paper machines (mechanical, electrical and instrumentation crafts)
  • Annual shutdown services (all mill areas)
  • Supplemental maintenance services since 1994

MONDI ŚWIECIE S.A., Poland, 2008 – 2009
  • A complete mechanical erection of the paper machine no. 7 manufacturing Testliner 3/WB Fluting paper with the core and roll handling systems, including erection of the headbox, press section, drying section with a sizing press, reel and winder, machine drives, blowing and exhaust ducts in the wet and dry end with a heat recovery system and a thermal hood, hydraulic installations, central lubrication and grease lubrication systems

Total value of the above project: 4.2 m USD
SUNDS MDF TECHNOLOGIES AB, Sweden, 2008 – 2009
  • Fabrication of rotary feeders for MDF manufacturing plants

Total value of the above projects: 192,000 USD
METSO PAPER SUNDSVALL AB, Sweden, 2005 – 2009
  • Fabrication of screw conveyors, tanks, storage bins and chip impregnators for pulp & paper industry

Total value of the above projects: 1.1 m USD
INTERNATIONAL PAPER Celimo, France, 2006 – 2009
  • Annual shutdown works at the Mill’s Woodyard

Total value of the above projects: 512,000 USD
VOITH PAPER FIBER SYSTEMS GmbH, Germany, 2007 – 2009
  • Fabrication of process equipment such as sorting drums, vats and tanks, pipelines and stainless steel structures for paper mills

Total value of the above projects: 464,000 USD
CAMFIL FARR POWER SYSTEMS GmbH, Germany, 2008 – 2009
  • Fabrication of air intake systems for gas turbines for power plants in Italy, France and Belgium

Total value of the above projects: 2.4 m USD
ITT WATER & WASTEWATER, France, Sweden, 2004 – 2009
  • Fabrication of pump accessories, lifting davit units and various steel parts

Total value of the above projects: 2.36 m USD
HARBURG FREUDENBERGER GmbH, Germany, 2006 – 2009
  • Erection and insulation of vulcanizing press pipelines at Michelin Olsztyn Plant
Total value of the above projects: 379,000 USD
JANSENS & DIEPERINK B.V., Netherlands, 2007 – 2009
  • Fabrication of steel structures (supports, pipe bridges, platforms, tank components)
Total value of the above projects: 1.3 m USD
MAAG GEAR ZAMECH Sp. z o.o., Poland, 2008 – 2009
  • Machining of sleeves, hubs, covers and shafts
Total value of the above projects: 141,000 USD
P.I.T. PROMET Sp. z o.o., Poland, 2007 – 2009
  • Fabrication of sugar chute side dampers
  • Fabrication of sugar lump crushers and screw conveyors for sugar manufacturing plants
Total value of the above projects: 738,100 USD
PASSAVANT GEIGER GmbH, Germany, 1995 – 2009
  • Fabrication and delivery of stainless steel equipment and elements for waste water treatment plants, continuous cooperation since 1995
Total value of the above projects: 3.7 m USD
SPECIALTY MINERALS TECHNOLOGIES (SMI), Poland and USA, 1995 – 2009
  • Fabrication and erection of tanks, process pipelines and equipment for the Precipitated Calcium Carbonate (PCC) Plant at SMI in Kwidzyn, including later expansions
  • Fabrication and erection of bolted and welded tanks with delivery to SMI plants in Portugal, France, Germany, Belgium, and Slovakia
  • Fabrication of Kady and IKA mill parts
  • Repairs of Lamson and Spenser compressors
Total value of the projects: 1.9 m USD
INTERNATIONAL PAPER Svetogorsk, Russia, 2001 – 2009
  • Erection of bark boiler pipelines
  • Erection of a Pemco sheeter and relocation and erection of the A3 paper sheeting line
  • Inspection and repair of the coating kitchen relocated from the USA
  • Supplemental maintenance services since 2002, and total maintenance since 2008 (by BE&K East)

POLISH SECURITY PRINTING WORKS S.A., Poland, 2005 – 2009
  • Positioning and erection of the paper machine no. 3 (mechanical, electrical and instrumentation crafts) together with erection of mist extraction, sprinkler, steam and condensate systems and compressed air installation
  • Positioning and mechanical and electrical erection of a mixing chamber for the paper machine no. 2; clean and servicing water chests repair
Total value of the above projects: 703,000 USD
ICT POLAND Sp. z o.o., Poland, 2000 – 2008
  • General contractor for erection of a new tissue paper machine for ICT Poland in Kostrzyn, Poland. Scope of work included fabrication and erection of process tanks and pipelines, erection of instrumentation, electrical installations and process equipment
  • Fabrication of a glue tank and the reel return system
Total value of the above projects: 3.9 m USD
POM TECHNOLOGY Oy AB, Finland, 2003 – 2008
  • Fabrication of stainless steel tanks with fittings
Total value of the above projects: 228,800 USD
SAHALA WORKS Oy, Finland, 2007 – 2008
  • Fabrication and delivery of heat exchangers and steam condensers
Total value of the above projects: 669,100 USD
GLOBAL OUTSOURCING ApS, Denmark, 2005 – 2008
  • Fabrication of tanks, man baskets (for oil rigs) and other stainless steel equipment
Total value of the above projects: 502,400 USD
SECO WARWICK S.A., Poland, 2006 – 2008
  • Fabrication of furnaces for heat treatment of aluminum and vacuum oven housings with fittings
Total value of the above projects: 1.8 m USD
METSO PANELBOARD GmbH, Germany, 2005 - 2007
  • Fabrication of steel structures and complete erection of an Energy Plant for Metso Panelboard at JELD-WEN Latvia and MDF PFLEIDERER in Grajewo, Poland facilities. Both projects included fabrication and erection of a bark boiler, hot oil installation, power supply and control system, fabrication and erection of supporting structures and hot air ducts
Total value of the above projects: 11.1 m USD
METSO PANELBOARD AB, Sweden, 2004 – 2007
    • Fabrication of a stainless steel cyclone, Z-sifters and air-ducts for KRONOTEX, Heiligengrabe, Germany
    • Fabrication of process equipment, Z-sifters, loaders, unloaders, presses, screw conveyors and rotary feeders, and other chipboard manufacturing process line elements
    Total value of the above projects: 3.1 m USD
    METSO PAPER GORIZIA S. p. A., Italy, 2005 – 2007
    • Fabrication of air ducts and supporting structures for the paper mill Delipapier GmbH, Arneburg, Germany
    Total value of the above project: 405,000 USD
    METSO PAPER INC., Finland, 2005 – 2007
    • Rebuilt of a paper machine at the International Paper Mill in Svetogorsk, Russia (including erection of a coater and a winder)
    • Installation of a paper machine reel section at the Paper Mill UPM Nordlandpapier in Dörpen, Germany
    Total value of the above projects: 1.0 m USD
    ANDRITZ Oy, Finland, 2007
    • Upgrade of the Evaporation Plant process systems at IP Kwidzyn and erection of service platforms and steel structures
    Total value of the above project: 254,000 USD
    SKOLWIN PAPER INTERNATIONAL Sp. z o.o., Poland, 2006 – 2007
    • Engineering, delivery and erection of structures and pipelines together with erection of the PM 1 calender
    Total value of the above projects: 365,000 USD
    KIMBERLY CLARK S.A., Poland, 1998 – 2007
    • Total maintenance services from 1998 to 2007
    • Repair services and modernizations of paper machines and process installations (mechanical, electrical and instrumentation crafts)

    METSÄ TISSUE S.A., Konstancin- Jeziorna, Poland, 2005–2007
    • Disassembly of an old and installation of a new flotator and sludge press in the water distribution and waste water treatment system. Rebuild of the flotator feeding pipelines at the Konstancin-Jeziorna Mill
    • Rebuild of the paper machine no. 5, including replacement of the press section, rebuild of a reel and air ducts for the Yankee cylinder at the Krapkowice Mill
    Total value of the above projects: 783,000 USD
    GDAŃSK "REMONTOWA" SHIPYARD S.A., Poland, 1999 – 2007
    • Fabrication and erection of pipelines on passenger and cargo ships
    Total value of the above projects: 338,000 USD
    T.P. ASPINALL & SONS Ltd, UK, 2004-2007
    • Fabrication of process equipment steel elements and structures for a copper foil production plant in China
    • Fabrication of structures and components followed by shop assembly of equipment for a copper foil production plant in Taiwan
    • Fabrication of handrails and balcony elements
    • Fabrication of elements for waste water treatment plants
    • Fabrication of steel viaduct bridge elements
    Total value of the above projects: 2.4 m USD
    REM STAHL-UND ANLAGENBAU GmbH, Germany, 2001 – 2007
      • Fabrication of steel structures for the facade of the National Bank of Abu Dhabi building, United Arab Emirates
      • Fabrication of a rotary steel structure to support glass wall of a building in Berlin, Germany
      • Fabrication of a supporting steel structure of Terminal II at the airport in Munich, Germany
      • Fabrication of supporting steel structure for a market hall in Milan, Italy
      • Fabrication of stainless steel structure of garden pavilion ATRIUM, passage roofing, and entrance to the Museum of Islamic Art in Doha, Quatar
      Total value of the above projects: 1.3 m USD
      JELD WEN Inc., USA, 2005
      • Fabrication of equipment and ducts and erection of Chip Dryer Plant equipment at JELD-WEN, Latvia
      • Erection of pneumatic dust handling system in the production area
      • Erection of a conveyor and wood storage as well as dust handling installations from board cutting areas
      Total value of the above projects: 1.8 m USD
      FMW - FÖRDERANLAGEN UND MASCHINENBAU AG,  Austria, 2000
      • Fabrication and mechanical and electrical erection of a bark boiler feeding system (bark conveyor) for IP Kwidzyn
      Total value of the above project: 282,000 USD
      MALTA-DECOR S.A., Poland, 1997 – 2000
      • General contractor in erection of a new paper machine. Scope of services included: fabrication and erection of process pipelines and tanks, installation of instrumentation systems, engineering, fabrication and erection of process tanks, chests, erection of paper machine and adjacent equipment
      • Annual shutdown services
      • General paper machine and process equipment repair work at Rudawa-Decor Paper Mill in Rudawa, Poland
      Total value of the above projects: 2.5 m USD
      AHLSTROM PUMPS, Finland, 1998 – 1999
      • Erection of two pulp storage towers (6000m3 and 9000m3) with adjacent process installations at International Paper Kwidzyn Mill
      Total value of the above projects: 830,000 USD
      MCCAIN POLAND Sp. z o.o., Poland, 1998 - 1999
      • Engineering, fabrication, erection and testing of utility and process pipelines
      • Engineering, fabrication and erection of storage tanks and pressure vessels (subject to the Polish Office of Technical Inspection requirements)
      • Erection of a steam boiler, process pipelines, electrical cabling and insulation
      • Fabrication and erection of steel structures (platforms, tank supporting structures, pipes, etc.)
      Total value of the above projects: 1.1 m USD